Whatsapp Image 2024 04 24 At 13.08.49 C8dd3669 Removebg Preview

QAP

QUALITY ASSURANCE / INSPECTIONS & TEST PLAN FOR PTFE & PFA LINED PIPE SPOOL, FITTINGS & VALVES

CODE COMPONENT / STAGE CHARACTERISTICS EXTENT OF CHECK REFRENCE DOCUMENTS / STD ACCEPTANCE NORMS
1) PROCEDURE QUALIFICATION
1.1
"Welding procedure & welder qualification"
WPS / PQR Record
100% Review
WPS, PQR, WPQ
ASME Sec IX
2) RAW MATERIAL INSPECTION
2.1
PTFE Resin
Ensure Lot / batch no. details are available on drum
100% Check Correlate Lot / Batch details with Manufacturer COC
ASTM D 4895
Manufacturer COC
2.2
CS Pipes, Flanges, Fittings, Valve Body/end piece & ball
Conformity check for Chemical / Mechanical Properties
100% Check if results given in MTC / lab report Comply with relevant material specs
Approved Drawing / Specification
Approved Drawing / ASTM F 1545
3) IN PROCESS / FABRICATION OF PIPES & FITTINGS (BEFORE LINING)
3.1
"Fabricated Pipe pool / fittings, machined castings"
Visual / Dimensional
100% Visual
Approved Drawing
Approved Drawing / ASTM F 1545
3.2
Weld quality check for fabricated pipes and fittings
"DP TEST / Radiography Tests"
"DPT - 100% for fillet/Socket Welds/Butt Welds, RT-10% of Butt Welds" Physical
Approved Procedures
ASME Sec V & ASME 31.3
Special Notes for Sr. No. 31. & 3.2
  • Check the full length of pipe bore for any sharp protrusions. Ensure that all vent holes drilled are deburred and finished to a smooth finish.
  • Recheck weld joints at both faces where radius is provided to ensure smooth finish of the weld. All sharp edges shall be removed / ground off to smooth finish.
4) PTFE LINER

All Liners are produced using the paste extrusion technique which involves processing PTFE fine powder without use of any pigments - the color is white. On completion of Sintering process, liners are:

  • Individually marked with respective batch number and sample pcs at random are cut off from tubes placed both, in front of the oven and also the rear for carrying out specific gravity and tensile, % elongation check.
  • All tubes are examined for cracks / deformation on the surface.
  • Liner batch no details to be transferred to respective metal pipe by means of a tag.
5) FINAL INSPECTION FOR LINED PRODUCTS
5.1
Hydrostatic Test
Physical
100% Visual
ASTM F 1545
"Procedure defined in ASTM F 1545 for Spools & fittings, EN12266-2 for Valves"
5.2
Continuity of Lining (spark test)
Physical
100% Spark Test 15 KV
ASTM F 1545
Procedure defined in ASTM F 1545
5.3
Thickness of Lining/Dimensional Check of spools
Physical
Flange Ends Measurement
ASTM F 1545
Meet min the requirements as given in ASTM F 1545/ Approved drawing/ Specification.
5.4
PTFE / PFA Linings
Physical
100% Visual
ASTM F 1545
"ASTM F 1545, Cl. 5.4, workmanship"
6) FINAL PACKING
6.1
Surface Cleaning / Paintings
Painting before final packing
100% Visual
Blast Cleaning Sa 2.5 + 1 coat of Self primed Epoxy (100-125 micron)
Visual
6.2
Packing
Physical
100% STD
Vendor Procedure
Both ends shall be secured with wooden blinds to avoid any damage to PTFE liner.